Gas and steam turbine overhauls, generator and multi-stage rotor works, heavy lifting, alignment and static-equipment installation — executed in controlled workshop conditions and on active industrial sites.
The partner profile covers gas and steam turbines, compressors, pumps and generators — from condition assessment through inspection, overhaul, balancing, alignment and return-to-service support.
Illustrative workshop and field imagery for gas and steam turbine maintenance, rotor work, alignment and related equipment.
Steam Turbine01Full rotor build-up and dimensional verification inside a controlled workshop environment prior to site dispatch.
Gas Turbine02Heavy lifting of a gas turbine upper casing and compressor section during a major inspection.
Site Maintenance03On-site removal and re-installation of a heavy-duty gas turbine using a purpose-built lifting frame.
Generator Rotor04Machined rotor inspected and prepared for balancing, coupling and reinstatement.
Overhaul05Rotor mounted on overhaul stands for blade inspection, NDT and journal restoration.
Storage06Long-term vertical storage of a steam turbine rotor in a controlled workshop with preservation controls.
Static Equipment07Rigging, positioning and installation of a large heat exchanger / pressure vessel package.
Multi-stage Rotor08Stage-by-stage inspection and refurbishment of a multi-stage steam turbine rotor.
LP Rotor09Low-pressure rotor with long last-stage blades placed on maintenance stands for detailed inspection.
Journal / Bearing10Machining and inspection of rotor journal and bearing surfaces to restore geometry within tolerance.
Rotor Handling11Example of rotor handling using turning gear and lifting fixtures.
Actuators & Valves12Maintenance of governing valves and hydraulic actuators associated with large rotating equipment.
Alignment13Illustrative rotor alignment and coupling check setup.
Casing Inspection14Internal inspection of a steam turbine rotor seated inside the lower casing during a scheduled outage.